News
Concern Grows Over Lokoja–Abuja Road as Tinubu’s Aide Demands Faster Execution from Contractors
Joel Ajayi
The Presidency has expressed concern over the slow pace of work on key federal road projects in Kogi State, urging contractors to accelerate construction to meet agreed timelines.
The Special Assistant to the President on Community Engagement, North Central, Dr. Abiodun Essieti, raised the concern on Monday during an inspection tour of major road projects across the state.
She described the level of work observed as unsatisfactory and far below expectations, considering the stipulated completion periods.
The inspection covered critical infrastructure projects, including the Lokoja–Abuja Road, the Anyigba road embankment, and the Abajana flyover. Dr. Essieti was accompanied by directors from the Federal Ministry of Works and members of the press.
She stressed that timely completion of the projects is crucial to easing transportation challenges, improving safety, and boosting economic activities within the North Central region.
Recall that the Minister of Works, Engr. David Umahi, had last year terminated four federal road contracts in Kogi State due to poor performance by contractors. During a subsequent inspection, the minister directed contractors handling ongoing projects to mobilize additional equipment and personnel to fast-track delivery.
However, months after the directive, little improvement has been recorded. Contractors, including Gitto and Sail-Through, were observed to have failed to meet project timelines and showed no visible signs of increased deployment of equipment at their respective sites.
The Presidency has therefore warned that continued delays will not be tolerated, reaffirming the Federal Government’s commitment to ensuring value for money and timely delivery of critical infrastructure projects.
News
FG Commits To National Development With Major Contract Agreements — Umahi
Joel Ajayi
The Federal Government, through the Federal Ministry of Works, has again signed landmark contract agreements with four (4) construction firms to execute critical road projects across the country, in line with the Renewed Hope Agenda of the administration of President Bola Ahmed Tinubu, GCFR. The contract signing ceremony, held on Thursday at the Ministry’s Headquarters in Mabushi, Abuja, marks another major step in the Federal Government’s commitment to delivering durable, sustainable road infrastructure that enhances connectivity, stimulates economic growth, and improves the quality of life of Nigerians.
The four contractors and their respective projects are as follows:
1. Messrs J. Patel and Sons Nigeria Limited – Reconstruction of Mando (Kaduna) – Birnin Gwari Road in Kaduna State,
2. Messrs JRB Construction Company Limited – Dualisation of Ibadan–Ijebu Ode Road in Oyo and Ogun States,
3. Messrs Truecrete Solutions Limited – Construction of Osogbo–Ikirun–Akoda Road in Osun State and
4. Messrs Peculiar Ultimate Concerns Limited – Construction of Osogbo–Iwo–Ibadan Road in Osun and Oyo States.
Speaking during the event, the Honourable Minister of Works, Engr. David Umahi, CON, FNSE, FNATE, described the projects as strategic national infrastructure designed to boost economic activities, improve transportation efficiency, and strengthen national integration. He noted that the reconstruction of the Mando (Kaduna) –Birnin Gwari Road in Kaduna State holds special significance, as it was one of the key infrastructure development commitments made by His Excellency, President Tinubu during the 2022/2023 electioneering campaigns. According to the Minister, the present administration remains resolute in its determination to deliver world-class infrastructure that will stand the test of time. “Our vision is to build roads that will last for generations. Under the Renewed Hope administration, we are determined to deliver infrastructure that can serve Nigerians for up to 100 years through the adoption of rigid pavement (concrete) technology,” Umahi stated.
The Minister commended the selected contractors for their competence, track records, and proven capacity, emphasising the Federal Government’s confidence in indigenous contractors. He particularly praised Messrs JRB Construction Company Limited, Truecrete Solutions Limited, and other indigenous firms for their commendable performances on previous projects across the country.
Umahi charged all contractors to mobilise to their respective project sites immediately and commence work without delay, stressing that the Ministry expects measurable progress within the stipulated timelines.
Earlier in his remarks, the Permanent Secretary, Mr. Rafiu Olarinre Adeladan, who formally signed the contract agreements, described the occasion as the successful completion of the procurement process and the official commencement of project implementation.
He commended the leadership of the Ministry for its commitment to ensuring that projects reached the execution stage and reaffirmed the Ministry’s dedication to effective monitoring, quality assurance, and timely delivery.
Also speaking, the Director of Highways, Construction and Rehabilitation, Mr. Clement Ogbuagu, presented details of the awarded contracts as follows:
1. Reconstruction of Mando–Birnin Gwari Road, Kaduna State
Contractor: Messrs J. Patel and Sons Nigeria Limited
Contract Sum: ₦178,116,787,162.00
Length: 122 Kilometres
2. Dualisation of Ibadan–Ijebu Ode Road, Oyo and Ogun States
Contractor: JRB Construction Company Limited,
Contract Sum: ₦295,996,609,992.77
Length: 114.5 Kilometres (Single Carriageway Equivalent)
3. Construction of Osogbo–Ikirun–Akoda Road, Osun State
Contractor: Truecrete Solutions Limited
Contract Sum: ₦101,806,585,825.90
Length: 70 Kilometres (Single Carriageway Equivalent) and
4. Construction of Osogbo–Iwo–Ibadan Road, Osun State
Contractor: Peculiar Ultimate Concerns Limited
Contract Sum: ₦114,854,477,607.93
Length: 73 Kilometres
All the projects will be executed using Continuously Reinforced Concrete Pavement (CRCP) technology, in line with the Federal Government’s commitment to building durable, cost-effective, and sustainable road infrastructure nationwide.
The ceremony represents another significant milestone in the Federal Government’s drive to modernise Nigeria’s road network and accelerate national economic development.
-
Featured7 years agoLampard Names New Chelsea Manager
-
Featured6 years agoFG To Extends Lockdown In FCT, Lagos Ogun states For 7days
-
Featured6 years agoChildren Custody: Court Adjourns Mike Ezuruonye, Wife’s Case To April 7
-
Featured7 years agoNYSC Dismisses Report Of DG’s Plan To Islamize Benue Orientation Camp
-
Featured5 years agoTransfer Saga: How Mikel Obi Refused to compensate me After I Linked Him Worth $4m Deal In Kuwait SC – Okafor
-
Sports4 years ago
TINUBU LAMBAST DELE MOMODU
-
News1 year agoZulu to Super Eagles B team, President Tinubu is happy with you
-
Featured7 years ago
Board urges FG to establish one-stop rehabilitation centres in 6 geopolitical zones
