News
President Tinubu Gives Go-Ahead for Full Implementation of Fourth Legacy Road
Joel Ajayi
President Bola Tinubu has directed the full implementation of the fourth Legacy Road Project, just as the contract will be awarded soon for speedy dualisation.
The fourth legacy road project, which is the dualisation of the Akwanga-Jos-Bauchi-Gombe road, will pass through the North Central, North West and North East zones.
Minister of Works, Engr. David Umahi stated this in Abuja during an interactive session with newsmen on President Bola Tinubu’s Renewed Hope Agenda for the road sector and various projects undertaken by the government to promote development and security, particularly in the Southeast zone.
Responding to the issues raised by Senator Enyinnaya Abaribe representing Abia South Senatorial District, the minister disclosed that President Tinubu is determined to ensure that the region is not left behind in national development.
He appreciated the Southeast Governors for their unwavering support to the President and his administration, especially Governor Alex Otti for the notable progress recorded in Abia State.
Highlighting achievements under the administration, the minister emphasised the significant strides made in nationwide infrastructure development.
He cited the Lagos–Calabar Coastal Highway, transversing nine (9) littoral states, noting that a substantial part of Section I, Phase 1 is already opened to motorists, with positive feedback from the residents of Lagos and its environs. He stressed that the project is a long-term investment in Nigeria’s future, not merely a road.
Umahi addressed misconceptions surrounding the project’s procurement process, stating that there are three procurement methods clearly provided for in the Public Procurement Act (PPA).
He said: “I challenge anyone to investigate and compare the procurement processes adopted in Lagos and other States. Across the country, several road projects are ongoing, with many nearing completion. Design works are also in progress for most of the other sections of the legacy projects in all geopolitical zones. The Lagos–Calabar Coastal Highway, including its elevated and portal sections, is progressing steadily.”
The minister was confident that these projects, when completed, will significantly improve mobility, stimulate socio-economic growth, and enhance the quality of life of Nigerians.
He expressed concern over the increasing rate of road infrastructure vandalism and encroachment by traders and motorists across the country.
“It is distressing to see that some parts of our roads in many states of the Federation have been taken over by traders and motorists. In Lagos, a bridge, which is a critical infrastructure, is used as a parking lot for trucks, which is not permissible. Similarly, the Abuja-Kano highway has been encroached by traders, who operate on one carriageway on a particular day of the week. This is unacceptable and poses a serious threat to the safety of road users,” the minister stated.
Umahi drew the attention of journalists to the menace of iron rod scavengers, who are removing iron rods from the median of the roads while compromising their structural integrity.
“This is a serious safety risk, and we must collectively take action to prevent it. I urge citizens to take it upon themselves to protect our road infrastructure, which is a collective responsibility,” he added.
To address the challenges, the minister announced that he will reach out to the Inspector General of Police for support to activate ‘Operation Safe Highways’, a multi-agency task force that was established to secure the nation’s highways.
He acknowledged the support of the police during inspections, as well as the contributions of the Department of State Security (DSS) and the Office of the National Security Adviser (NSA).
“The activation of a section of the Police known as Operation Safe Highway in all states will help to clear and secure our road infrastructure. I assure Nigerians that we will not relent in our efforts to ensure that our roads are safe and secure for all users,” the minister assured.
Umahi appealed to citizens to report any case of road infrastructure vandalism or encroachment to the relevant authorities and to support the government’s efforts to protect our roads.
He reassured Nigerians of the Federal Government’s untiring resolve to national development and security, adding that remarkable progress has been recorded in the road infrastructure sector and that the government will continue to work diligently to deliver quality infrastructure.
Reiterating the government’s stance on transparency, the minister maintained that accountability remains paramount, just as he invited the public for the unbiased scrutiny of all procurement processes by the ministry.
The Minister of State, Bello Muhammad Goronyo, Esq. urged Nigerians to visit the projects and appraise the quality of work delivered at the sites.
He indicated that the government’s improved road infrastructure, which includes solar-powered street lighting has made driving safer and more enjoyable.
Goronyo added that Nigerians are free to invite anti-corruption agencies such as the ICPC and EFCC to independently investigate the administration’s road infrastructure projects.
While responding to questions from journalists, he minister said that the contract for the construction of a flyover and bridges at Okoolowo and Shao in Kwara State will soon be awarded.
He promised that the projects will bring relief to commuters and residents of the area, who have been affected by the long absence of the critical infrastructure.
On the recurring traffic gridlock along Mararaba road, especially Mogadishu Cantonment spot, the minister explained that the said alignment falls under the jurisdiction of the Federal Capital Territory Administration (FCTA).
He directed the Permanent Secretary in the ministry to contact the Permanent Secretary of FCTA for immediate remedial measures.
The interactive session was a testament to the ministry’s commitment to transparency and accountability.
Several journalists commended the minister for his dedication to improving road infrastructure across the country. They acknowledged the renewed efforts in addressing the challenges faced by Nigerians on a daily basis on the roads.
The Permanent Secretary, Mr. Rafiu Olarinre Adeladan emphasised the strong collaboration between the ministers, directors, and other staff of the ministry, noting that teamwork remains key to achieving the Federal Government’s developmental goals.
He appreciated the journalists for attending the interactive session and the minister for his sterling leadership.
The Federal ministry of works remains committed to delivering on its mandate to provide and maintain Nigeria’s road infrastructure, just as the minister looked forward to continous engagement with stakeholders to ensure that road travels are safe, economical, timely, and seamless.
This was contained in a statement by the Director of Press and Public Relations, Mohammed Abdullahi Ahmed in Abuja.
News
FG Commits To National Development With Major Contract Agreements — Umahi
Joel Ajayi
The Federal Government, through the Federal Ministry of Works, has again signed landmark contract agreements with four (4) construction firms to execute critical road projects across the country, in line with the Renewed Hope Agenda of the administration of President Bola Ahmed Tinubu, GCFR. The contract signing ceremony, held on Thursday at the Ministry’s Headquarters in Mabushi, Abuja, marks another major step in the Federal Government’s commitment to delivering durable, sustainable road infrastructure that enhances connectivity, stimulates economic growth, and improves the quality of life of Nigerians.
The four contractors and their respective projects are as follows:
1. Messrs J. Patel and Sons Nigeria Limited – Reconstruction of Mando (Kaduna) – Birnin Gwari Road in Kaduna State,
2. Messrs JRB Construction Company Limited – Dualisation of Ibadan–Ijebu Ode Road in Oyo and Ogun States,
3. Messrs Truecrete Solutions Limited – Construction of Osogbo–Ikirun–Akoda Road in Osun State and
4. Messrs Peculiar Ultimate Concerns Limited – Construction of Osogbo–Iwo–Ibadan Road in Osun and Oyo States.
Speaking during the event, the Honourable Minister of Works, Engr. David Umahi, CON, FNSE, FNATE, described the projects as strategic national infrastructure designed to boost economic activities, improve transportation efficiency, and strengthen national integration. He noted that the reconstruction of the Mando (Kaduna) –Birnin Gwari Road in Kaduna State holds special significance, as it was one of the key infrastructure development commitments made by His Excellency, President Tinubu during the 2022/2023 electioneering campaigns. According to the Minister, the present administration remains resolute in its determination to deliver world-class infrastructure that will stand the test of time. “Our vision is to build roads that will last for generations. Under the Renewed Hope administration, we are determined to deliver infrastructure that can serve Nigerians for up to 100 years through the adoption of rigid pavement (concrete) technology,” Umahi stated.
The Minister commended the selected contractors for their competence, track records, and proven capacity, emphasising the Federal Government’s confidence in indigenous contractors. He particularly praised Messrs JRB Construction Company Limited, Truecrete Solutions Limited, and other indigenous firms for their commendable performances on previous projects across the country.
Umahi charged all contractors to mobilise to their respective project sites immediately and commence work without delay, stressing that the Ministry expects measurable progress within the stipulated timelines.
Earlier in his remarks, the Permanent Secretary, Mr. Rafiu Olarinre Adeladan, who formally signed the contract agreements, described the occasion as the successful completion of the procurement process and the official commencement of project implementation.
He commended the leadership of the Ministry for its commitment to ensuring that projects reached the execution stage and reaffirmed the Ministry’s dedication to effective monitoring, quality assurance, and timely delivery.
Also speaking, the Director of Highways, Construction and Rehabilitation, Mr. Clement Ogbuagu, presented details of the awarded contracts as follows:
1. Reconstruction of Mando–Birnin Gwari Road, Kaduna State
Contractor: Messrs J. Patel and Sons Nigeria Limited
Contract Sum: ₦178,116,787,162.00
Length: 122 Kilometres
2. Dualisation of Ibadan–Ijebu Ode Road, Oyo and Ogun States
Contractor: JRB Construction Company Limited,
Contract Sum: ₦295,996,609,992.77
Length: 114.5 Kilometres (Single Carriageway Equivalent)
3. Construction of Osogbo–Ikirun–Akoda Road, Osun State
Contractor: Truecrete Solutions Limited
Contract Sum: ₦101,806,585,825.90
Length: 70 Kilometres (Single Carriageway Equivalent) and
4. Construction of Osogbo–Iwo–Ibadan Road, Osun State
Contractor: Peculiar Ultimate Concerns Limited
Contract Sum: ₦114,854,477,607.93
Length: 73 Kilometres
All the projects will be executed using Continuously Reinforced Concrete Pavement (CRCP) technology, in line with the Federal Government’s commitment to building durable, cost-effective, and sustainable road infrastructure nationwide.
The ceremony represents another significant milestone in the Federal Government’s drive to modernise Nigeria’s road network and accelerate national economic development.
-
Featured7 years agoLampard Names New Chelsea Manager
-
Featured6 years agoFG To Extends Lockdown In FCT, Lagos Ogun states For 7days
-
Featured6 years agoChildren Custody: Court Adjourns Mike Ezuruonye, Wife’s Case To April 7
-
Featured7 years agoNYSC Dismisses Report Of DG’s Plan To Islamize Benue Orientation Camp
-
Featured5 years agoTransfer Saga: How Mikel Obi Refused to compensate me After I Linked Him Worth $4m Deal In Kuwait SC – Okafor
-
Sports4 years ago
TINUBU LAMBAST DELE MOMODU
-
News1 year agoZulu to Super Eagles B team, President Tinubu is happy with you
-
Featured7 years ago
Board urges FG to establish one-stop rehabilitation centres in 6 geopolitical zones
